Guest sauna at level 52, Shangri-La at The Shard — Sharp Line Construction
Guest sauna at level 52, Shangri-La at The Shard — Sharp Line Construction
Cord restaurant at Le Cordon Bleu London — Sharp Line Construction
Cord restaurant at Le Cordon Bleu London — Sharp Line Construction
Hotel bathroom at Shangri-La at The Shard — Sharp Line Construction
Hotel bathroom at Shangri-La at The Shard — Sharp Line Construction

Commercial Kitchen Refurbishment London

Sharp Line Construction carries out the building works for restaurant, hotel and school kitchens in London: floors, wall finishes, plumbing, electrics, ceilings and decoration. Your catering equipment supplier installs the equipment, and we coordinate our work with theirs.

Since 2013 · Insured: £10m Employers' Liability, £1m Public Liability · CSCS-carded, SMSTS-supervised · Free site visit and itemised written quote

What's included

  • Floors. Slip-resistant floor tiling or safety flooring.

  • Walls. Wall tiling or hygienic wall cladding that can be washed down.

  • Plumbing. Sinks, hand-wash basins, wastes and water supplies for equipment. See commercial plumbing.

  • Electrics. Circuits, sockets and lighting by a certified electrician. See commercial electrical.

  • Ceilings. Washable suspended ceilings.

  • Gas. Gas connections by a Gas Safe registered engineer.

  • Making good. Decoration and repairs to the areas around the kitchen.

Our experience

  • Cord restaurant, Fleet Street. Decoration, plumbing, tiling and electrical works for Le Cordon Bleu's restaurant, as main contractor.

  • Le Cordon Bleu London, Bloomsbury. Decoration, plumbing, tiling and electrical works at the culinary school, as main contractor.

How we work

  • Around your service. Night shifts and closed days, so the kitchen keeps trading where possible. See out-of-hours building works.

  • In phases. Larger kitchens are done section by section.

  • With your other contractors. We agree dates with the equipment supplier and the extraction specialist.

  • Paperwork. Risk assessments, method statements and insurance certificates before work starts.

Price

Every kitchen is priced after a free site visit, with an itemised written quotation.

Questions we're often asked

Do you supply catering equipment?

No. We carry out the building works. Your catering equipment supplier supplies and installs the equipment, and we coordinate with them.

Do you install kitchen extraction?

No. Extraction and ventilation are installed by a specialist. We carry out the building work around it.

Can you work while the restaurant stays open?

Yes. We work night shifts and closed days, and phase larger kitchens section by section.

Have you worked in professional kitchens?

Yes. We were main contractor for decoration, plumbing, tiling and electrical works at Le Cordon Bleu London and at Cord, Le Cordon Bleu's restaurant on Fleet Street.

Related: Restaurant fit-out in Central London · Restaurant fit-out · Hospitality fit-out · Builders in Central London

Get a fixed price for your project. Request a free site visit and quote, call 020 7476 2770 or message us on WhatsApp. You get an itemised written quotation, so you can see what every part costs.

© 2026. All rights reserved. Sharp Line Construction Ltd | Reg. Office: Chichester Close, London E6 5QJ | Company number 08639916 | VAT Reg. No. 426893265 | Privacy Policy

Contact
QR code to save Sharp Line Construction contact details (phone and email)
QR code to save Sharp Line Construction contact details (phone and email)

Scan to save our contact details